Uttara Sector 10, Dhaka 2024 G+9 ResidentialClient · Afiya Developments
A G+9 residential building delivered on schedule with RCC frame, seismic detailing and premium finishes.
Full civil scope: piling, RCC frame, MEP coordination and external finishing. Our site team maintained a zero lost-time incident record across 14 months on site.
Concrete mix was designed for M30, tested by third-party lab, and all rebar was BSRM 500W. Every slab pour was logged with cube-test reports.
Project highlights
- M30 tested concrete, BSRM 500W rebar
- Delivered 3 weeks ahead of schedule
- Zero lost-time incidents on site